Trail update: A new line and go around built today. Both are located right after the step down bridge. The new line is just a faster way around the sand corner. I did not block the old line so you have an option to use it or not.
The go around was built to avoid the narrow gap between the two (deep) ditches. The old trail has been blocked off. The new trail will be faster and much more enjoyable once it's broke in.
Trail is in great shape, get out there and ride
Trail update
Trail update
Author: Bruce
Date: November 18th, 2020